Please send enquiry to sales@furthergo.com for deatailed products information.

40ft/45ft ISO container gas supply system function:
1) flexible, Do not rely on natural gas pipe network, need to use LNG tanker to carry LNG as a source. Control system is installed in a converted standard container; Before filling LNG, its only 14t.
2) process on the integral pump in the structure of the container is an organic whole repeatedly, submersible pump fluid keep pump in the pool in the cold and can start at any time.
3) can be combined with gas station, website building cycle is short, the construction cost and operation cost is low, fast and safe.
Charging device process consists of filling, charging, pressurization of three basic processes.
Unloading process:
1) pump unloading: installed on the container of LNG cryogenic submersible pump to unload
2) tank lorry differential pressure unloading: will be in the container